Optimization of MU-MIMO beamforming in a wi-fi communication network based on mobility profiles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9769828
SERIAL NO

14937845

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An access point associated on Wi-Fi portion of the communication network selectively groups stations according to a mobility profile. The mobility profile includes factors that characterize at least an amount of movement and current location for a station. Each station is assigned to a beamforming group of similar mobility profiles. A type of beamforming transmission is selected for each beamforming group based on mobility profiles of associated stations. The type of beamforming transmissions including at least MU-MIMO and SU-MIMO. Data is then transmitted to the stations of each beamforming group according to the selected type of beamforming transmissions. A Wi-Fi controller, having a network-wide view of conditions and being able to collect historical information about stations during connections to other access points, is able to provide data unique data to group selections.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FORTINET, INC.;FORTINET, LLC;MERU NETWORKS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaushik, Anil Bangalore, IN 65 377

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00