Manufacturing method of gears for a speed change device and its apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9770752
SERIAL NO

14524302

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method and apparatus for gears for a speed change device. The gears having a large end and a small end forming a reverse-tapered tooth part on an outer circumference thereof, spline teeth of an intermediate material having the small end provided in a rim of the large end thereof, a plurality of dies having a radial shape and an inclination angle to a gear axial line and slidably holding to an inclined axial line on a holding member are slid from outside of the radiation direction toward the center by a pushing cam mechanism, thereby pushing the reverse-tapered blade part formed at the leading end of the die, the spline teeth are formed in the reverse-tapered tooth part, and the die is slid by an extracting mechanism from the center of the radiation direction toward the outside along the inclined axial line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOHSYU CORPORATION1-1 ISHIBE MIDORIDAI 2-CHOME KONAN-SHI SHIGA 520-3189

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukushima, Mikio Shiga, JP 3 28
Tanaka, Makoto Shiga, JP 342 5714
Tasaki, Kenji Shiga, JP 13 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00