Crosslinked cellulose as precursor in production of high-grade cellulose derivatives and related technology

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9771687
SERIAL NO

15067749

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pulp in accordance with a particular embodiment includes crosslinked cellulose fibers. The pulp can have high brightness, reactivity, and intrinsic viscosity. The pulp, therefore, can be well suited for use as a precursor in the production of low-color, high-viscosity cellulose derivatives. A method in accordance with a particular embodiment of the present technology includes forming a pulp from a cellulosic feedstock, bleaching the pulp, crosslinking cellulose fibers within the pulp while the pulp has a high consistency, and drying the pulp. The bleaching process can reduce a lignin content of the pulp to less than or equal to 0.09% by oven-dried weight of the crosslinked cellulose fibers. Crosslinking the cellulose fibers can include exposing the cellulose fibers to a glycidyl ether crosslinker having two or more glycidyl groups and a molecular weight per epoxide within a range from 140 to 175.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL PAPER COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lou, Mengkui Auburn, US 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00