Systems and methods for scheduling of data packets based on delay tolerance of applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9774525
APP PUB NO 20140286256A1
SERIAL NO

14224731

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A base station, system, method, and computer program product are disclosed for transmitting data packets received by the base station. According to one aspect, the base station includes a first buffer configured to store data packets received by the base station, a second buffer configured to store data packets that are scheduled for transmission by the base station, and a computer processor, operatively coupled to the first buffer and the second buffer. The computer processor is configured to inspect a data packet to determine an application type of the data packet, determine a delay tolerance associated with the data packet based on the determined application type, determine a channel condition of a communication session with the user device, move the data packet from the first buffer to the second buffer based on the determined delay tolerance and the determined channel condition, and transmit data packets stored in the second buffer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALTIOSTAR NETWORKS INC200 AMES POND DRIVE TEWKSBURY MA 01876

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chowdhury, Kuntal Andover, US 81 3498
Nguyen, Si Winchester, US 18 256

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00