Sole structure for a running shoe

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9775403
SERIAL NO

13839306

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sole structure for a running shoe is presented having an outsole and a midsole. The sole structure includes a plurality of hollow elements, which are closed off in each case by front flanks and rear flanks, and have spaced-apart upper inner surfaces and lower inner surfaces, that forces to which the hollow elements are subjected when the runner is running are absorbed by these hollow elements in each case with deformation, with the spacing between their inner surfaces decreasing in the process. The upper inner surfaces of the hollow elements are formed on the underside of the midsole, that the lower inner surfaces of the hollow elements are formed on the upper side of the outsole, which is fastened on the underside of the midsole in each case in front of, and behind, the hollow elements, the front flanks and the rear flanks likewise forming part of the outsole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ON CLOUDS GMBH8005 ZÜRICH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernhard, Olivier Heiden, CH 14 297
Heitz, Ilmarin Zürich, CH 13 224

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00