Method for conditioning and processing whole or thin stillage to aid in the separation and recovery of protein and oil fractions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9776105
SERIAL NO

12949850

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of processing thin stillage in an ethanol refining operation is provided. The method comprises treating thin stillage upstream of a concentration or evaporation step with an inverse emulsion comprising at least one anionic flocculant and an emulsifying agent selected from a sorbitan ester of a fatty acid, an ethoxylated sorbitan ester of a fatty acid, and combinations thereof, thereby forming treated thin stillage; clarifying the treated thin stillage via at least one of dissolved air flotation and induced air flotation, thereby forming clarified thin stillage and a float layer comprising oil and solids; separating the oil from the solids of the float layer; and recovering the oil.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECOLAB USA INC1 ECOLAB PLACE ST PAUL MN 55102

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Collins, John H Bloomingdale, US 20 341
Eastin, Philip M Saint Louis, US 4 58
Scheimann, David W Joliet, US 17 296
Van't, Hul Jason S Harrisburg, US 3 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00