Pilger rolling train

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9776228
SERIAL NO

14426403

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Pilger rolling train, which operates continuously for producing a tube, includes a pilger rolling mill for reducing the diameter of a hollow blank to form the tube, a first buffer for a plurality of tubes, wherein the first buffer has a device for bundling a plurality of tubes in a bundle, an annealing furnace for simultaneous annealing of a plurality of tubes, a second buffer for a plurality of tubes, wherein the second buffer for the tubes has a device for separating the plurality of tubes out of a bundle, and a straightening machine for straightening the separated tubes in succession, wherein the devices are disposed, in the direction of flow of the tube, in the aforementioned sequence, and wherein an automated transport device for the tube is provided between, respectively, the pilger rolling mill, the first buffer, the annealing furnace, the second buffer and the straightening machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLEIMA GMBH33824 WERTHER

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Froböse, Thomas Versmold, DE 22 27
Rauffmann, Udo Werther, DE 13 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00