Snow removal device, vehicle, and track transportation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9777450
APP PUB NO 20160069033A1
SERIAL NO

14839867

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A snow removal device includes: a brush rotary shaft that is mounted on a vehicle body traveling along a track and in front of a running wheel of the vehicle body and that is rotated in a direction opposite to the rotation direction of the running wheel; a travel brush part that protrudes radially outward from an outer circumferential surface of the brush rotary shaft and comes into contact with a runway of the track with which the running wheel is in contact; and a brush pressing part that presses the travel brush part toward the runway. The travel brush part is provided in a spiral region formed on the outer circumferential surface of the brush rotary shaft in a spiral manner extending toward an axis direction in which the axis extends as going toward a circumferential direction of the brush rotary shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 100-8332

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katahira, Kousuke Tokyo, JP 47 424
Tamura, So Tokyo, JP 17 96

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00