System and method for displaying planned speed values

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9778056
SERIAL NO

14501489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system are provided to obtain, with one or more processors, a speed profile of a vehicle system for a designated route traveled by the vehicle system. The designated route includes a plurality of segments, and the speed profile includes a planned segment speed for each segment. One or more planned segment speeds are identified that correspond to a point of interest, and respective priorities are assigned to the identified segment speeds based on the point of interest forming prioritized segment speeds. First discrete numeral values are displayed on a display, representing the planned segment speeds of the prioritized segments that are within a predetermined distance forward of a motion of the vehicle system. Second discrete numeral values are displayed on the display, corresponding to remaining segment speeds that are within the predetermined distance, until a predetermined threshold of discrete numeral values is reached.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE GLOBAL SOURCING LLC901 MAIN AVENUE NORWALK CT 06851

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Golden, Samuel William Melbourne, US 22 223
Kapp, Kevin L Melbourne, US 2 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00