Transport network tunnel setup based upon control protocol snooping

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9781001
APP PUB NO 20170041190A1
SERIAL NO

14820000

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Rather than there being a requirement that specific instructions be issued to cause a transport network tunnel to be configured, it is proposed herein to have a transport node autonomously determine that a transport network tunnel is to be configured and, responsively, cause the transport network tunnel to be configured. In general, a transport node (an L0/L1 device) adjacent to the packet device at the origin of LACP messages snoops on the LACP messages. The transport node may determine, based on the contents of a control LACP message, that a new packet network link is to be established between the origin packet device and a destination packet device. Responsive to the determining, the transport node adjacent to the origin packet device causes a transport network tunnel to be established between one of its ports and a port at a transport node adjacent the destination packet device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ashwood-Smith, Peter Gatineau, CA 120 3281

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00