Process and composition of catalyst/additive for reducing fuel gas yield in fluid catalytic cracking (FCC) process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9783743
APP PUB NO 20140116923A1
SERIAL NO

14148107

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a catalyst composition for Fluid Catalytic Cracking (FCC) which contains a combination of a FCC catalyst component and an additive component with certain physical properties attributed therein. The present invention is also directed to provide methods for the preparation of the catalyst composition for FCC. The admixture of the FCC catalyst component and additive component is used in cracking of hydrocarbon feedstock containing hydrocarbons of higher molecular weight and higher boiling point and/or olefin gasoline naphtha feedstock for producing lower yield of fuel gas without affecting the conversion and yield of general cracking products such as gasoline, propylene and C4 olefins.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RELIANCE INDUSTRIES LIMITED400021 MUMBAI MAHARASHTRA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chinthala, Praveen Kumar Andhra Pradesh, IN 8 83
Das, Asit Kumar Gujarat, IN 40 357
Dinda, Srikanta West Bengal, IN 3 37
Gohel, Amit Gurajat, IN 4 40
Mandal, Sukumar Haryana, IN 35 322
Ravichandran, Gopal Tamil Nadu, IN 14 129
Yadav, Ashwani Haryana, IN 4 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00