System and method for guard band utilization for synchronous and asynchronous communications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9787515
SERIAL NO

15161023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments are provided for guard band utilization for synchronous and asynchronous communications in wireless networks. A user equipment (UE) or a network component transmits symbols on data bands assigned for primary communications. The data bands are separated by a guard band having smaller bandwidth than the data bands. The UE or network component further modulates symbols for secondary communications with a spectrally contained wave form, which has a smaller bandwidth than the guard band. The spectrally contained wave form is achieved with orthogonal frequency-division multiplexing (OFDM) modulation or with joint OFDM and Offset Quadrature Amplitude Modulation (OQAM) modulation. The modulated symbols for the secondary communications are transmitted within the guard band.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abdoli, Javad Kanata, CA 82 269
Jia, Ming Ottawa, CA 419 10163
Ma, Jianglei Ottawa, CA 823 15895
Vilaipornsawai, Usa Nepean, CA 33 374

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00