Power conversion apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9788449
APP PUB NO 20160081233A1
SERIAL NO

14844157

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion apparatus 2 has a configuration in which a plate-like bus-bar 80, 80′ is disposed vertically so that a width direction thereof is set in a vertical direction, electrically connected to positive electric potential of a battery and fixed to a resin case 50 to include a flat plate-like bus-bar body 81, 82, to which positive electric potential of the battery is applied, and a voltage measuring terminal 82 to 85 branched from the bus-bar body 81, 82. The voltage measuring terminal 82 to 85 includes a projecting portion 83 projecting from the bus-bar body 81, 82, an upright portion 84 extending from the projecting portion 83 upward toward a circuit board 100, and a measuring terminal portion 85 that is an upper part of the upright portion 84 and electrically connected to the circuit board 100.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI ASTEMO LTDIBARAKI 312-8503

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iida, Hiroaki Tochigi, JP 13 173
Maeda, Yasuhiro Tochigi, JP 90 472
Nagasawa, Kazuya Tochigi, JP 10 34
Nishio, Hitoshi Wako, JP 12 105
Ogura, Masami Tochigi, JP 39 700
Shigemasa, Morifumi Tochigi, JP 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00