Vertical aeroponic plant growing enclosure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9788495
SERIAL NO

15168960

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A grow plant enclosure to maximize plant density for a given growing area has a perimeter frame, a first pane, and a second pane. The first pane is adjacently connected to the perimeter frame, while the second pane is removably attached to the perimeter frame opposite the first pane to form a hollow enclosure. A plurality of plug holder openings traverses through the first pane, and optionally the second pane, being designed to receive a plurality of plant holders for growing various plant types. A plurality of supply tubes traverse into the perimeter frame through a plurality of supply tube openings and each have a plurality of spray nozzles to deliver nutrient solution to the root zone of the plants retained in the plurality of plant holders. Excess nutrient solution is released through a drain fixture positioned about the bottom of the perimeter frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INDOOR FARMS OF AMERICA, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Evans, Ronald R Las Vegas, US 5 87
Martin, David W Las Vegas, US 53 523

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00