Unibody hopper trailer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9789801
SERIAL NO

14915725

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hopper trailer has a chassis with longitudinal rails mounted to a wheeled suspension. Triangular load transfer plates are mounted vertically on and carried by the longitudinal rails. A container has opposing sidewalls, opposing end walls, and two sloping walls each spanning between and adjoining the opposing sidewalls. The sloping walls and the sidewalls form a hopper. One of the sloping walls is mounted on and carried by the load transfer plates. The sidewalls are mounted to and carried by the sloping wall. The weight of a bulk material carried in the hopper and the weight of the sidewalls is carried by the sloping wall. This weight is transferred vertically downwardly from the sidewall through the load transfer plate into the chassis without substantial deflection from a vertical path. Bending stresses caused in the hopper slopes and floor frame of conventional trailers by indirect weight transmission is avoided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TITAN TRAILERS INCR R #3 DELHI N4B 2W6

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bracewell, Bryan Morris Woodstock, CA 3 5
Kloepfer, Michael Delhi, CA 40 275
Maertens, Andrew Joseph Delhi, CA 16 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00