Floor coating compositions containing supramolecular polymers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790394
APP PUB NO 20160230035A1
SERIAL NO

15025114

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an aqueous floor coating composition comprising: (A) water; (B) at least one supramolecular polymer; and (C) optionally, one or more additional ingredients. The supramolecular polymer (B) comprises polymerized units derived from: (1) one or more 4H monomers which comprise a polymerizable group and a quadruple hydrogen bonding (4H) moiety; (2) at least one monomer having acid functional groups; and (3) one or more ethylenically unsaturated monomers. In a preferred embodiment, the supramolecular polymer comprises 4H monomers derived from reaction of an isopropenyl alpha,alpha-dimethylbenzyl isocyanate (TMI) and 2-amino-4-hydroxy-6-methylpyrimidine (MIC), as well as acid functional monomers selected from (meth)acrylic acid, and ethylenically unsaturated monomers comprising butyl acrylate, methyl methacrylate, and styrene.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROHM AND HAAS COMPANY400 ARCOLA ROAD COLLEGEVILLE PA 19426

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Karikari, Afua Sarpong Bristol, US 20 18
Tysak, Theodore Ambler, US 43 181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00