Synthesis of polyurethane polymers via copper azide-alkyne click chemistry for coatings, adhesives, sealants and elastomer applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790398
SERIAL NO

14766342

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application is directed at the reaction product of an azide compound having two or more azide groups attached thereto and an alkyne compound having two or more alkyne groups attached thereto, wherein the azide and alkyne groups react in a 1,3-dipolar cyclo addition to form 1,4-disubstituted triazols and wherein the azide or alkyne compound or both include —O—(C═O)—NR— functional groups. The reaction products can be used as coatings, such as for flat roofs, sealants, adhesives and in elastomer applications. Methods for producing the reaction products as well as substrates including a coating of the reaction product are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIKA TECHNOLOGY AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byrne, Michael Lytham, GB 44 401
Carter, Neil Southport, GB 13 255
Cormack, Peter Glasgow, GB 5 43
Coward, Alexander Sale, GB 9 33
Cullen, John E Glasgow, GB 1 17
Gatrell, Mark Chipping Preston, GB 9 33
Martin, Ian Barrow, GB 71 1041

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00