Serial and parallel LED configurations for linear lighting modules

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9791112
APP PUB NO 20160186940A1
SERIAL NO

14582194

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A linear lighting module includes a first string of series-connected LED dies and a second string of series-connected LED dies. The first string of LED dies is coupled in parallel with the second string of LED dies. All of the LED dies of the first and second strings are aligned with respect to one another. The LED dies of the first string and the second string form a combined string of interleaved LED dies such that an LED die of the second string is disposed between every successive pair of LED dies of the first string. The LED dies of the combined string are mounted on a flexible substrate. Each LED die of the combined string is electrically connected to two conductors. Except for the two end LED dies of the combined string, each successive LED die must be accessed by both conductors from alternating sides of the combined string.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRIDGELUX INC46410 FREMONT BOULEVARD FREMONT CA 94538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Del, Castillo Jesus Palo Alto, US 9 121
Odnoblyudov, Vladimir Danville, US 224 1501

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00