Power generation system and method of operating power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9791154
SERIAL NO

14646729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system includes: a combustor operative to combust a fuel; a power generator operative to utilize energy obtained from the combustor when generating electric power; a fuel supplier operative to supply the fuel to the combustor; an air supplier operative to supply combustion air to the combustor; a discharged gas passage through which a discharged gas from the combustor flows; a CO detector operative to detect CO in the discharged gas; a temperature detector operative to detect a temperature of the discharged gas; and control circuitry operative to, when the discharged gas is flowing through the discharged gas passage, perform at least one of an operation of detecting a structural abnormality of the discharged gas passage based on a difference between detected temperatures of the temperature detector relative to a difference between heated amounts of the discharged gas heated by a heater and an operation of detecting the structural abnormality of the discharged gas passage based on the difference between the detected temperatures of the temperature detector relative to a difference between outputs of at least one of the fuel supplier and the air supplier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDOSAKA-SHI OSAKA 540-6207

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iiyama, Shigeru Osaka, JP 4 38
Taguchi, Kiyoshi Osaka, JP 72 498
Tatsui, Hiroshi Shiga, JP 25 318
Yukimasa, Akinori Osaka, JP 51 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00