Multilayer circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9793275
APP PUB NO 20120032345A1
SERIAL NO

13259177

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer circuit (400) includes a base layer (205) which has a number of base vias (247, 415), a first overlying layer (215) formed on the base layer (205) and having a first routing section (210) and a second overlying layer (220) formed on the first overlying layer (215). The second overlying layer (220) has a second routing section (210) and is formed using the same set of masks. The first routing section (210) and the second routing section (210) form a unique electrical pathway (248) between a base via (247) and an element in an overlying layer. A method for forming a multilayer circuit is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddressTotal Patents
HEWLETT PACKARD ENTERPRISE DEVELOPMENT LPHOUSTON, TX9302

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Borghetti, Julien Mountain View, US 18 88
Strukov, Dmitri Borisovich Mountain View, US 11 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 17, 2021
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00