Connector assembly with a blade connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9793620
SERIAL NO

15253300

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector assembly for electrically contacting a blade connector to a second connector The connector assembly includes a blade connector which has a contact surface plane that is electrically connected to the second connector in the mated state. In order to improve mechanical and electrical properties of the overall connector assembly and, in particular, of the blade connector, the assembly further includes a mounting cage in which the blade connector is captively held and which has at least one clamping device that presses the second connector onto the contact surface plane of the blade connector in the mated state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TYCO ELECTRONICS UK LTDFARADAY ROAD SWINDON WILTSHIRE SN3 5HH
TE CONNECTIVITIY GERMANY GMBHAMPERESTRASSE 12-14 BENSHEIM D-64625

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eckel, Markus Burstadt, DE 21 157
Fertig, Jochen Bensheim, DE 15 45
Marsh, John London, GB 25 202
Meier, Rudiger Neckargemund, DE 2 7
Stange, Holger Frankenthal, DE 7 48
Ulrich, Harald Fischbachtal, DE 12 18
Zech, Konstantin Leimen, DE 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00