Rotor of an electric motor, with an outer sleeve formed by winding, method for producing such a rotor, and electric motor comprising such a rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9793771
APP PUB NO 20150326081A1
SERIAL NO

14647780

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric motor rotor including a magnetic core, magnets fastened to the periphery of the magnetic core, and a wire wound with touching turns around the magnetic core and the magnets. The wire includes a metal core surrounded by an electrically insulating layer, itself covered by an outer sheath of thermo-adhesive material, the turns being fastened to one another by adhesion between mutually contacting portions of the outer sheath. A method of fabricating such a rotor. An electric motor including such a rotor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN ELECTRONICS & DEFENSE92100 BOULOGNE-BILLANCOURT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andre, Bruno Boulogne Billancourt, FR 3 0
Bessede, Thierry Boulogne Billancourt, FR 3 0
Piaton, Jerome Boulogne Billancourt, FR 13 64
Princay, Gaetan Boulogne Billancourt, FR 2 0
Rabret, Bernard Boulogne Billancourt, FR 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00