System and method for coupling helmet components and liners

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9795180
SERIAL NO

14500535

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A helmet an include a shell, a liner disposed within the shell, a flexible band disposed between the shell and a portion of the liner to releasably couple the liner to the shell without glue, hook and loop fasteners, or snaps. The helmet can also include an energy-absorbing layer of expanded polystyrene (EPS) including a groove. The comfort liner can be attached to the energy-absorbing layer without glue, hook and loop fasteners, or snaps, and a flexible band can be releasably disposed between the energy-absorbing layer and the comfort liner. The helmet can also include a groove on an inner surface of an outer shell. An energy-absorbing liner can include expanded polypropylene (EPP), and a flexible band can be disposed between the outer shell and the energy-absorbing liner to provide additional energy management, to releasably couple the energy-absorbing liner to the outer shell, or both.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BELL SPORTS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Briggs, Eamon Santa Cruz, US 17 153
Lowe, Michael W Santa Cruz, US 19 282

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00