Concrete mixer with perfected auxiliary device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9796113
APP PUB NO 20160199999A1
SERIAL NO

14770712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete mixer truck comprises a vehicle provided with a heat engine and a concrete mixer having a rotating drum and an auxiliary device provided with a unit for generating electric energy that selectively feeds an electric motor connected to the rotating drum. The electric energy generating unit comprises at least an alternator selectively connectable to the heat engine and to a movement unit of the vehicle by means of a gearbox and a power take-off positioned between the clutch of the vehicle and the gearbox. The alternator is configured to convert mechanical energy into alternate electric energy and vice versa. The electric energy generating unit also comprises at least one accumulator and reversible conversion means of electric energy, connected to the accumulator and to the alternator in order to selectively take continuous electric energy from the former and supply alternate electric energy to the latter, to move the drive wheels of said movement unit, or to convert the alternate electric energy produced by the alternator into continuous electric energy to be transferred to the accumulator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CIFA SPA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheli, Federico Milan, IT 7 45
Mapelli, Ferdinando Olginate, IT 4 25
Pirri, Nicola Milan, IT 17 100
Tarsitano, Davide Caronno Pertusella, IT 6 31
Zorzi, Emanuele Cesano Maderno, IT 7 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00