Turbine rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797256
SERIAL NO

14380603

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide a turbine rotor which enables mass production with a low-cost apparatus and which capable of suppressing leaning of the rotor shaft after welding to improve the yield, while a turbine blade rotor 12 and the rotor shaft 14 are fit to each other with concave and convex portions 12a and 14a and are permitted to be rotated, laser beam L from a laser beam generating device 30 is applied to a joint face 16 along the circumferential direction to weld the welding portion. Then, laser beam L is polarized to temper a region X on the rotor shaft side containing the welding portion with laser beam L. In contrast to residual stress R1 having a local angular distribution generated during the welding, residual stress R2 is permitted to be generated over the entire circumference by tempering. Leaning of the rotor shaft 14 after cooling is thereby be suppressed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTDTOKYO 1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arai, Takashi Tokyo, JP 236 2194
Ebisu, Motoki Tokyo, JP 44 499
Otsubo, Hitomi Tokyo, JP 4 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00