High-efficiency power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797274
SERIAL NO

15023794

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-efficiency power generation system includes: at least one first heat exchanger, inside which is full of a liquid actuating medium with a low boiling point; a hydraulic power generator; a gas-liquid recycling device; a liquefying device and a control device. The present disclosure accomplishes a recirculation for an entire power generating procedure through two steps including vaporization and a recycle of the actuating medium with a low boiling point by liquefaction. A technical difficulty in the conventional art that huge costs for realizing recycle of the actuating medium by a compressor, a booster pump, etc. can be overcome. In addition, since the present disclosure generate power through the liquid pressure rather than the gas pressure, the conversion efficiency can be improved and the requirement for performance of material for the system can be lowered, so that the economical efficiency and practicability for the entire system are highly improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUO SONGWEI201199 SHANGHAI CITY MINHANG DISTRICT ROAD 399 LANE 6 SPRING ROOM 1102 NO MUNICIPAL DISTRICT SHANGHAI CITY 201199

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Songwei Minhang Shanghai, CN 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00