Weldless building structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797430
SERIAL NO

14988314

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A building structure including a first building member and a second building member may be connected by a plurality of fasteners, each fastener having a head, a threaded portion having a through hardness of between HRB 70 and HRC 40, a thread-forming portion of at least HRC 50 hardness enabling the fastener to form threads in at least the second steel building member, and a fluted lead portion of at least HRC 50 hardness with a nominal diameter between 70 and 95% of major diameter, such that the fastener is capable of providing a ratio of strip torque to thread-forming torque of at least 3.0 and a ratio of strip torque to drive torque greater than 6.0 when the second steel building member having a thickness of 0.25 inch and the fluted lead portion having at least one diameter within nominal diameter between 80 and 98% of major diameter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUCOR CORPORATION1915 REXFORD ROAD CHARLOTTE NC 28211
ASIA FASTENING (US) INC2700 CENTERVILLE ROAD SUITE 400 WILMINGTON DE 19808

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dayton, Lionel E Decorah, US 10 32
Lukes, Richard W Decorah, US 17 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00