Analyzing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797915
SERIAL NO

14020039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an analyzing system including a commanding unit for sending a command and an executing unit for executing a processing upon receiving the command, a processing instruction may not be executed at the right time due to a heavy traffic of information and other factors. In order to solve this problem, in a preparative separation system 1 according to the present invention, a PC 20 provides the execution time for starting/finishing the fractionation processing to a controller 18. Therefore, even in the case where the time of the PC 20 and that of the controller 18 are not synchronized, the controller 18 can accurately set the execution time for starting/finishing the fractionation in a preparative separation unit 16. A piping 17 may be placed so that the traveling time of sample components is sufficiently larger than the delay time of signals due to the signal transfer lag and other reasons. This can absorb the delay time, allowing the units to cooperate with each other at a correct timing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHIMADZU CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Munetaka, Keisuke Kyoto, JP 3 14
Yanagisawa, Toshinobu Kyoto, JP 17 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00