Correlating consumption and voltage data to identify line loss in an electric grid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9799083
SERIAL NO

14525307

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems, methods, and other embodiments associated with identifying non-technical line loss using data from smart meters in an electric grid are described. In one embodiment, a method includes querying a utility database to collect meter data, wherein the meter data is from electric meters connected to a transformer in an electric grid. Querying the utility database includes collecting the data according to a plurality of intervals over a period of time. Electric consumption and voltage variances are analyzed for the set of meters to identify a first set of intervals that satisfy a threshold for electric consumption and to identify a second set of intervals that satisfy a threshold for voltage variances. The first set of intervals is compared with the second set of intervals to determine whether the set of meters are associated with non-technical line loss.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ORACLE INTERNATIONAL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Steigler, Patrick Oakland, US 5 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00