Bi-directional double-pass multi-beam writing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9799487
SERIAL NO

15073935

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To irradiate a target with a beam of energetic electrically charged particles, the beam is formed and imaged onto a target, where it generates a pattern image composed of pixels. The pattern image is moved along a path on the target over a region to be exposed, and this movement defines a number of stripes covering said region in sequential exposures and having respective widths. The number of stripes is written in at least two sweeps which each have a respective general direction, but the general direction is different for different sweeps, e.g. perpendicular to each other. Each stripe belongs to exactly one sweep and runs substantially parallel to the other stripes of the same sweep, namely, along the respective general direction. For each sweep the widths, as measured across said main direction, of the stripes of one sweep combine into a cover of the total width of the region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMS NANOFABRICATION GMBH2345 BRUNN AM GEBIRGE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Platzgummer, Elmar Vienna, AT 61 3384

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00