Semiconductor device and manufacturing method of the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9799612
SERIAL NO

15325745

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a substrate, a laminated wiring layer unit, a nitride film disposed on the laminated wiring layer unit, a semiconductor element portion, a sealing portion surrounding the element portion. In the sealing portion, multiple wiring layers are connected with a sealing layer to configure a sealing structure which surrounds the element portion. The laminated wiring layer unit includes an uppermost layer which is made of material having higher adhesion to an uppermost wiring layer, and a protection insulating film made of material having higher adhesion to the sealing layer than the nitride film is disposed on the nitride film. In the sealing portion, a via-hole is defined in the protection insulating film, the nitride film, and the uppermost insulating film to partially expose the uppermost wiring layer. The sealing layer is embedded into the via-hole and is also disposed on a protection insulating film around the via-hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DENSO CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eguchi, Kouji Kariya, JP 7 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00