Field effect transistor having electrode coated sequentially by oxide layer and nitride layer and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9799742
SERIAL NO

15356927

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A field effect transistor includes a substrate, an epitaxial layer, a remnant-oxide layer, an electrode, a surrounding-oxide layer, a surrounding-nitride layer, a gate oxide layer, a gate, a P-body region, a source region, an interlayer dielectric and a source electrode. The epitaxial layer on the substrate has a trench having a sidewall and a bottom. The electrode inside the trench is coated subsequently by the surrounding-oxide layer, the surrounding-nitride layer and the remnant-oxide layer. The gate formed on the gate oxide layer is separated from the electrode sequentially by the gate oxide layer, the surrounding-nitride layer and the surrounding-oxide layer. The P-body region and the source region, formed at the epitaxial layer, are separated from the gate by the gate oxide layer. The interlayer dielectric covers the source region and the gate. The source electrode covers the P-body region and the interlayer dielectric, and contacts the source region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amanullah, Mohammad New Taipei, TW 4 3
Liang, Shu-Siang New Taipei, TW 4 3
Mrinal, Aryadeep New Taipei, TW 8 3
Tsai, Yi-Lung New Taipei, TW 21 82
Yang, Po-Wen New Taipei, TW 7 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00