Josephson junction readout for graphene-based single photon detector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9799817
SERIAL NO

15279008

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A detector for detecting single photons of infrared radiation or longer wavelength electromagnetic radiation. In one embodiment a waveguide configured to transmit infrared radiation is arranged to be adjacent a graphene sheet and configured so that evanescent waves from the waveguide overlap the graphene sheet. In other embodiments a transmission line or antenna is coupled to the graphene sheet and guides longer-wavelength photons to the graphene sheet. A photon absorbed by the graphene sheet heats the graphene sheet. Part of the graphene sheet is part of the Josephson junction as the weak link, and a constant bias current is driven through the Josephson junction; an increase in the temperature of the graphene sheet results in a decrease in the critical current of the Josephson junction and a voltage pulse in the voltage across the Josephson junction. The voltage pulse is detected by the pulse detector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RAYTHEON BBN TECHNOLOGIES CORP.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fong, Kin Chung Lexington, US 20 83
Ohki, Thomas A Arlington, US 6 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00