Motor stator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9800097
APP PUB NO 20160043598A1
SERIAL NO

14653624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor stator structure includes multiple teeth and multiple arched bridge sections respectively connected between the tooth roots of the adjacent teeth. Each of the arched bridge sections has an arched section extending along two adjacent sides of a predetermined parallelogram. The motor stator structure further includes multiple enlarged sections a respectively positioned at the tooth roots of the teeth. Each of the arched bridge sections is positioned outside the range of the corresponding enlarged section. The motor stator structure is composed of multiple small stators stacked on each other. At least two punched splits are respectively positioned between the tooth roots of two adjacent teeth to separate the adjacent teeth. The space of two ends of the arched bridge section is enlarged to increase the pass space of magnetic field.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHANG CHIAHUNGTAICHUNG CITY 420

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Chiahung Taichung, TW 1 4
Wen, Peihui Taichung, TW 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00