Method for mixing in a hydrocarbon conversion process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9802176
APP PUB NO 20160279594A1
SERIAL NO

14666362

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sequential mixer for mixing a heated hydrocarbon stream and a supercritical fluid to produce an intimately mixed stream upstream of a supercritical reactor. The sequential mixer comprising a body having a body length and a body diameter; a hydrocarbon inlet physically connected to the body, having an inlet diameter, the heated hydrocarbon stream is introduced through the hydrocarbon inlet; a mixed stream outlet physically connected to the body and fluidly connected to the supercritical reactor, having an outlet diameter; a traversing axis extending through the center of the body from the hydrocarbon inlet to the mixed stream outlet; and a plurality of fluid ports physically connected to the body, the plurality of fluid ports are arranged in a port alignment arrayed along the traversing axis, each fluid port has a port diameter and a port angle, the supercritical fluid is injected through the plurality of fluid ports.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYDHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alabdullah, Mohammad A Dhahran, SA 9 83
Alotaibi, Bader M Dammam, SA 6 16
Choi, Ki-Hyouk Dhahran, SA 130 1013
Garhoush, Mohammad S Dammam, SA 7 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00