Bale processor and flail for use with same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9802201
SERIAL NO

14616489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a bale processor includes a hopper for receiving baled material, a discharge opening for outputting chopped material, and primary and secondary rotors. The primary rotor has an axis of rotation and a rotatable flail to chop the material from the bale received in the hopper. The secondary rotor is rotatable to chop the material after being chopped by the primary rotor, and the secondary rotor is offset from the primary rotor such that the primary rotor is between the secondary rotor and the discharge opening. The flail includes a pivot tube for rotating about the axis, first and second hammers secured to the pivot tube, and a paddle. The paddle is positioned between and secured to the first and second hammers to generate airflow when the first and second hammers are rotated at an operating speed, thereby increasing a throw distance of the chopped material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VERMEER MANUFACTURING COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Egging, Phil Reasnor, US 2 3
Graham, Lucas New Sharon, US 5 6
Johnson, Bjorn Altoona, US 4 8
Landon, David Pella, US 6 144
Muchtar, Wanti Pella, US 5 13
Mushitz, Luke Yankton, US 2 3
Schiferl, Tyler Pella, US 3 3
Stam, Phil Pella, US 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00