Brake control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9802592
SERIAL NO

14717559

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The brake control device comprises a control mode selecting portion 64 which selects one control mode based on a detection result of the detecting portion from a control mode group including at least two control modes which are a responsiveness priority mode which gives more priority to a responsiveness of the braking force relative to an operation of a brake operating member than to a suppression of an operating noise occurred upon the generation of the preparatory hydraulic pressure and a serenity priority mode which gives more priority to the suppression of the operating noise than to the responsiveness of the braking force. The hydraulic pressure control portion controls the hydraulic pressure generating device to generate the preparatory hydraulic pressure in response to the control mode selected by the control mode selecting portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ADVICS CO., LTD.;TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamiya, Yusuke Okazaki, JP 55 274
Nakata, Daisuke Seto, JP 85 642
Okano, Takahiro Chiryu, JP 80 376

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00