Power control device and hybrid construction machine provided with same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9802600
APP PUB NO 20160214597A1
SERIAL NO

14914544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a power control device, when the necessary power is greater than an upper limit value and either the integral power value or the duration time of an assist provided by an electric storage device during a continuous assist by the electric storage device exceeds a predetermined first threshold value, a controller performs a first control of reducing an assist power by the electric storage device to a value smaller than an assist power for the regular control and greater than zero. Further, when the necessary power is greater than the upper limit value and either the integral power value or the duration time exceeds a predetermined second threshold value greater than the first threshold value, the controller performs a second control of setting the assist power to zero.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOBELCO CONSTRUCTION MACHINERY CO., LTD.;KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nanjo, Takao Kobe, JP 10 96
Yamashita, Koji Hiroshima, JP 278 2930

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00