Hydrocracking process with interstage steam stripping

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803148
SERIAL NO

13559846

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a hydrocracking process, the product from the first stage reactor passes through a steam stripper to remove hydrogen, H2S, NH3, light gases (C1-C4), naphtha and diesel products. The stripper bottoms are separated from hydrogen, H2S, NH3, light gases (C1-C4), naphtha, and diesel products and treated in a second stage reactor. The effluent stream from the second stage reactor, along with the stream of separated hydrogen, H2S, NH3, light gases (C1-C4), naphtha, and diesel products, are passed to a separation stage for separating petroleum fractions. Preferably, the effluent stream from the first stage reactor is passed through a steam generator prior to the steam stripping step. In an alternate embodiment, the effluent stream from the first stage reactor is passed through a vapor/liquid separator stripper vessel prior to the steam stripping step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN COOPERATION CENTER FOR PETROLEUM AND SUSTAINABLE ENERGY58 FL SUNSHINE 60 BUILDING 3-1-1 HIGASHI IKEBUKURO TOSHIMA-KU TOKYO 170-6058

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Abdul'al, Ali H Qatif, SA 5 126
Koseoglu, Omer Refa Dhahran, SA 146 1904
Nakano, Koji Fukuoka, JP 113 1061
Ushio, Masaru Kanagawa, JP 63 612

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00