Hurricane resistant fabric clamps

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803797
SERIAL NO

15018291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A storm protection system for covering the opening of a building with a flexible material. The system includes a bracket having a first panel and a second panel, the panels each having a surface, the first surface and the second surface of the bracket having a plurality of protrusions disposed thereon (and various embodiments thereof). Another embodiment utilizing at least one inclined planar portion connected to a planar portion of the bracket at the first edge of the inclined planar portion and an elongated member connected to the at least one inclined planar portion for securing a flexible material. A last embodiment includes a planar bracket having a first end and a second end, the planar bracket made of a resilient material. All embodiments operable to hold a flexible material (fabric, screen . . . etc.) over an opening to a building to protect the opening during a storm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Motosko, Catherine Sarasota, US 9 31
Motosko, Stephen J Sarasota, US 32 279
Motosko,, III Stephen J Sarasota, US 7 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00