Integrated process for NGL (natural gas liquids recovery) and LNG (liquefaction of natural gas)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803917
SERIAL NO

14143755

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an integrated process and apparatus for liquefaction of natural gas and recovery of natural gas liquids. In particular, the improved process and apparatus reduces the energy consumption of a Liquefied Natural Gas (LNG) unit by using a portion of the already cooled overhead vapor from a fractionation column from an NGL (natural gas liquefaction) unit to, depending upon composition, provide, for example, reflux for fractionation in the NGL unit and/or a cold feed for the LNG unit, or by cooling, within the NGL unit, a residue gas originating from a fractionation column of the NGL unit and using the resultant cooled residue gas to, depending upon composition, provide, for example, reflux/feed for fractionation in the NGL and/or a cold feed for the LNG unit, thereby reducing the energy consumption of the LNG unit and rendering the process more energy-efficient.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LINDE ENGINEERING NORTH AMERICA INC5 SENTRY PARKWAY EAST SUITE 300 BLUE BELL PA 19422

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bauer, Heinz Ebenhausen, DE 104 1074
Burmberger, Stephan Neuried, DE 4 21
Goldbeck, Danielle R Tulsa, US 2 21
Hertel, Christoph Wolfratshausen, DE 3 21
Key, Ronald D Broken Arrow, US 8 127
Marty, Aleisha Broken Arrow, US 2 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00