Multiplex control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9804575
SERIAL NO

14837274

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a multiplex control device includes three or more control modules to execute same operations for same input signals, and a majority decision module to output an output signal that matches majority of output signals outputted by the control modules. Each control module includes an input module to convert an input signal into an input value, a first determination module to obtain input values from input modules of respective control modules to determine whether majority of input values among the obtained input values match, an operation executing module to execute an operation using the matched input value to generate an output value, a second determination module to obtain output values from operation executing modules of respective control modules to determine whether majority of output values among the obtained output values match, and an output module to convert the matched output value to generate an output signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maruchi, Shunya Itabashi, JP 3 6
Nakatani, Hiroshi Tama, JP 105 857
Ohnishi, Naoya Kodaira, JP 10 26
Yoshida, Yukitaka Fuchu, JP 8 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00