Composite simulation modeling and analysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9805143
SERIAL NO

13750806

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aspect of handling a plurality of simulated models includes receiving from a first simulation model a stream of source data and determining data processing compatibility between the simulation model and a second-simulation model by i) obtaining metadata relating to the first-simulation models from a memory and ii) obtaining metadata relating to the second simulation model from the memory. An aspect also includes generating a transformation component using a schema mapping tool for providing compatibility between the first and second simulation models upon a determination that the compatibility does not exist between the two models. The—transformation component is generated—using the metadata relating to the first and second simulation models. The method also includes generating a—stream of target data by the second simulation model via the transformation component. The second simulation model uses the stream of source data as input.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haas, Peter J San Jose, US 32 351
Kieliszewski, Cheryl A San Jose, US 5 36
Maglio, Paul P Catheys Valley, US 7 814
Mak, Ronald San Jose, US 6 75
Selinger, Patricia G San Jose, US 7 434
Tan, Wang-Chiew San Jose, US 20 531

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00