Coil component and method of manufacturing coil component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9805856
APP PUB NO 20150357111A1
SERIAL NO

14725407

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A magnetic core (50) has a core shaft part which is inserted into a bobbin part, and configures a magnetic path of magnetic flux formed by a coil (40); the magnetic core (50) is configured by combining a pair of magnetic components (51, 52); the magnetic components (51, 52) have core ends formed so as to cross a core shaft part; the base part (20) has a fitting part which fits with at least one of the pair of core ends, when the core shaft part is inserted into the bobbin part; and the coil component (100) is characterized in that the pair of magnetic components (51, 52) and the bobbin base (10) are fixed to each other, while being bound by a sheet-like fixation member (70) which extends over the core end and the base part having been fitted to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMIDA CORPORATIONTOKYO 104-8547

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sasaki, Naoki Natori, JP 36 443

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00