Semiconductor device and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9805954
SERIAL NO

14567235

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method forms an oxide insulating layer and a first plasma etching treatment forms a depressed portion therein. A second plasma etching treatment forms a trench including curved lower corner portions. An oxide semiconductor film is formed in contact with a bottom portion, the curved lower corner portions, and side portions of the trench. Source and electrodes are formed to be electrically connected to the oxide semiconductor film. A gate insulating layer is formed over the oxide semiconductor film and a gate electrode is formed over the gate insulating layer. The first plasma etching treatment is performed with a first bias power and a first power of a first power source, and the second plasma etching treatment is performed with a second bias power and a second power of a second power source, wherein the second bias power is lower than the first bias power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEMICONDUCTOR ENERGY LABORATORY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishizuka, Akihiro Sagamihara, JP 45 443
Sasagawa, Shinya Chigasaki, JP 232 4025

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00