Controlling channel length for vertical FETs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9806153
SERIAL NO

15428712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vertical-type semiconductor device includes a first source/drain (S/D) region on an upper surface of a semiconductor substrate. A channel region is on an upper surface of the first S/D region, and extends along the vertical axis to define a channel length. A second S/D region is on an upper surface of the channel region, and separates the second S/D region from directly contacting the semiconductor substrate. An electrically conductive gate wraps around all outer surfaces of the channel region. The gate extends along the vertical axis to define a gate length that is less than the channel length. Dielectric gate elements are interposed between an upper surface of the gate and a lower surface of the second S/D region, and are configured to electrically insulate the gate from the second S/D region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Kangguo Schenectady, US 3073 29791
Xie, Ruilong Schenectady, US 1432 10785
Yamashita, Tenko Schenectady, US 599 4981
Yeh, Chun-Chen Clifton Park, US 417 3476

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00