FinFET structure and method for fabricating the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9806178
SERIAL NO

15374963

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method comprises recessing a substrate to form a fin enclosed by an isolation region, wherein the substrate is formed of a first semiconductor material, recessing the fin to form a trench over a lower portion of the fin, growing a second semiconductor material in the trench to form a middle portion of the fin through a first epitaxial process, forming a first carbon doped layer over the lower portion through a second epitaxial process, growing the first semiconductor material over the first carbon doped layer to form an upper portion of the fin through a third epitaxial process, forming a first source/drain region through a fourth epitaxial process, wherein a second carbon doped layer is formed underlying the first source/drain region and applying a thermal oxidation process to the middle portion of the fin to form an oxide outer layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Guan-Lin Hsin-Chu, TW 104 519
Ching, Kuo-Cheng Zhubei, TW 366 6920
Liu, Chi-Wen Hsin-Chu, TW 280 6281
Wang, Chao-Hsiung Hsin-Chu, TW 132 2178

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00