Semiconductor devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9806204
APP PUB NO 20150054054A1
SERIAL NO

14536250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a semiconductor device, the method including forming a tunnel insulating layer on an upper surface of a substrate, forming gate patterns on an upper surface of the tunnel insulating layer, forming capping layer patterns on sidewalls of the gate patterns and on the upper surface of the tunnel insulating layer, etching a portion of the tunnel insulating layer that is not covered with the gate patterns or the capping layer patterns to form a tunnel insulating layer pattern, and forming a first insulating layer on the upper surface of the substrate to cover the gate patterns, the capping layer patterns, and the tunnel insulating layer pattern, wherein the first insulating layer has an air gap between the capping layer patterns.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Sung-Soo Hwaseong-si, KR 8 62
Chung, Seung-Pil Seoul, KR 36 1205
Jung, Won-Bong Suwon-si, KR 6 99
Kim, Bum-Soo Incheon, KR 61 1160
Kim, Hyun-Sung Siheung-si, KR 7 35
Kwon, O Ik Seongnam-si, KR 8 473
Shin, Kyoung-Sub Seongnam-si, KR 43 353
Yun, Min-Kyung Seoul, KR 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00