Electrostatic discharge protection for a transformer balun

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9806521
SERIAL NO

14527205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A balun includes an input coil and an output coil with first and second outputs that vary during normal operation. The output coil has a center point connection that remains substantially constant during normal operation. An ESD circuit provides a low impedance path between the center point connection and chip ground when the voltage at the center point connection is above a first threshold voltage or below a second threshold voltage and isolates the center point connection from chip ground otherwise. Another ESD protection circuit provides ESD protection for other input or output terminals of the integrated circuit by selectively coupling the other input or output terminals to chip ground. Thus, a charge that builds up between one of the balun outputs and another terminal on the integrated circuit can be safely dissipated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SILICON LABORATORIES INC400 WEST CESAR CHAVEZ AUSTIN TX 78701

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Khazhinsky, Michael G Austin, US 15 214
Kummaraguntla, Ravi K Austin, US 14 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00