Stator with neutral line secured to stator yoke

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9806577
SERIAL NO

14755465

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The stator includes a stator core, a plurality of phase windings, a neutral line and a fixing member. The plurality of phase windings are wounded a plurality of times by a predetermined winding method crossing between a plurality of slots. One lead end of each phase winding is supplied with a phase current. The other lead end of each phase winding is a neutral point connecting portion. The other lead end is pulled out from an axially end portion of the stator core. The neutral line connects the neutral point connecting portions of the phase windings of different phases together. The neutral line is separate from the phase windings. The fixing member fixes the neutral line to a yoke portion via an intermediate member. The intermediate member is made of resin.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwamoto, Hirotsugu Nisshin, JP 5 6
Kaneshige, Keiichi Seto, JP 17 91
Maruyama, Tetsuya Kariya, JP 51 593
Matsumoto, Masashi Nagoya, JP 111 566
Sakata, Yuji Toyota, JP 19 127
Shishido, Kuniyoshi Anjo, JP 2 10
Watanabe, Atsushi Toyota, JP 466 6819

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00